The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
NCOC team distributes masks among drivers, passengers
-
Traditional zoos to be transformed into ‘open caged’ ones soon: SAPM
-
Shehbaz lashes out Imran Khan for skyrocketing prices of petrol and electricity
-
Civilian killings in IIOJK refer to Modi’s playbook of repression, violence: JKNF
-
Govt hospitals in capital running without MRI machines, NA told
-
Provinces urged to provide 3pc NFC share to erstwhile FATA
-
Matsuda performs ground-breaking of PIMS child health centre expansion
-
PDM decides to organize provincial committees for protests
-
SBP governor comes under fire in NA
-
Sheikh Rasheed reaches Pakistan from UAE, amidst the protests
-
CTD kills nine terrorists in Mastung
-
Data exposes FATF’s ‘politicised’ approach targeting Muslim states