The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Crackdown against criminals continues as per directions of IG Punjab
-
Three people of a family murdered in DIK over personal animosity
-
Govt places women and girls at centre of all Ehsaas programs: Dr. Sania
-
HABIBMETRO building goes pink to raise breast cancer awareness
-
Senate body on defence visits NHQ
-
PCB advertises for new chief executive
-
Investigation against NAB stricken tehsildar in FGEHA assigned to FIA
-
NAB fails to detain Siraj Durrani amid strong resistance by supporters
-
No polio virus detected in 23 big cities of Pakistan: sources
-
Aiwan-e-Sadr certified as world’s first presidency to go green, save Rs 72m annually
-
IGP orders steps to save police personnel from dengue
-
Pakistan introduces new social media rules to remove unlawful content